[3] The vessel was designed as a simple barge form, with a 245-metre (804 ft) length similar to a Suezmax tanker. Oil and gas produced from the 42 subsea wells in the Schiehallion field are piped to the FPSO for processing and then offloaded on to a shuttle boat for delivery to the Sullom Voe terminal. Abo FPSO: Abo: Gulf of Guinea, Nigeria The current position of GIRASSOL is at West Africa (coordinates 7.65298 S / 11.67999 E) reported 20 days ago by AIS.. Here the vessel and the crew are ready to work in the Schiehallion field. The moorings would be used to anchor up an FPSO. Category:BP FPSO Schiehallion (ship, 1998) From Wikimedia Commons, the free media repository. Please Login to add a comment! Ulsan, Korea, Q2 2015. The design and construction of the Schiehallion FPSO vessel was contracted to the Atlantic Frontier Alliance, an ad hoc contracting consortium consisting of Harland and Wolff, SBM Offshore, and Brown and Root. BP’s Quad 204 project sought to extend the field’s life beyond 2035, ramping up production to 130,000 barrels per day and unlocking a further estimated 450 million barrels. [3] The vessel was designed as a simple barge form, with a … But the original Schiehallion FPSO required replacing and technological advances proved there was more to be gained from the fields. Production capacity: 50,000 bpd: Storage capacity: 580,000 bbls: Length Overall: 246.80 metres: Breadth: 42.0 metres: Depth: 21.3 metres: Deadweight tonne: 100,810 tonnes Information. The Schiehallion Field is situated in the UK waters of the North Atlantic, some 100 miles west of the Shetland Islands. Maersk Supply Service was chosen for the job because it could provide vessels with the necessary capabilities. Quad 204 FPSO. • Further expansion to the riser and subsea system will take place during project. The Schiehallion floating production, storage, and offloading vessel (FPSO) is moored by a turret-mooring system (TMS) located in a water depth of 400 m in the Atlantic in very challenging environmental conditions. The area incorporates the Schiehallion, Loyal and Alligin fields.The first phase of development of the Schiehallion and Loyal fields was sanctioned in 1996. Quad 204 project replaced the existing Schiehallion FPSO vessel with a larger FPSO and extended the life of the field. Information about the vessel may be found at IMO 9183439. The Quad 204 project is a development of the greater Schiehallion field area, comprising of a new floating production, storage and offloading (FPSO) vessel, new seabed infrastructure and utilizing enhanced oil recovery technology. A ship can change name and flag state through time, but the IMO number remains the … The field is now successfully producing oil, utilising a newbuild FPSO, currently the largest of its type in operation, together with subsea wellheads, flowlines and flexible risers. The design and construction of the Schiehallion FPSO vessel was contracted to the Atlantic Frontier Alliance, an ad hoc contracting consortium consisting of Harland and Wolff, SBM Offshore, and Brown and Root. Phase III includes Schiehallion’s tow to field and the mooring of the new FPSO, to be carried out in 2015. Vessel size 133,000 DWT to 600,000 DWT UNIT MOORING SYSTEM SCOPE FIRST OIL or CONTRACT AWARD (CA) CLIENT FIELD COUNTRY LAST OIL FPSO Schiehallion New Build 1998 BP Schiehallion UK 2013 FPSO Capixaba New Build Relocation 2006 2010 Petrobras Petrobras Golfinho Cachalote Brazil Brazil 2009 -FPSO P-53 New Build 2008 Petrobras Marlim Leste Brazil - Due to come on stream in 2016, the Quad 204 project will extend production from the hub beyond 2015. This photo has been shown 982 times since it was added to the site. The Schiehallion FPSO has a storage capacity for 950,000 barrels of crude oil in 14 tanks, and a peak processing capability for 154,000 bpd, and a 12,000-tonne topsides payload. That vessel is still under development. The Greater Schiehallion Area is located 140 kilometres west of Shetland. Startup year. This paper describes the design and construction of the vessel forming the platform for the Schiehallion FPSO. ARCADION are delighted to have completed a major project for BP’s Glen Lyon FPSO (Quad 204), due to be deployed to the Schiehallion/ Lyon Field in the North Sea. Phase II, occurring in 2014, is the recovery of the old mooring system and installation of the new FPSO anchoring system, including the 20 new piles and chain and spiral strand wire mooring system. Process plant designed to handle 130,000 barrels of oil and 220 million cubic feet of gas per day. The project involved installing 14 suction anchors, each weighing approximately 60 tonnes, at BP’s Schiehallion field in the North Sea. Jump to navigation Jump to search. The Schiehallion FPSO went onstream in 1998. Watch a construction time lapse video of the FPSO below. ... (FPSO) vessel, with superior seakeeping and long-term processing capabilities. Replacing an FPSO and develop the subsea system: • The existing FPSO ‘Schiehallion’ will be replaced by the new build Glen Lyon. The Schiehallion FPSO was specially designed to withstand … Glen Lyon at HHI. Model : NIKON D5000 Exposure : 1/800, 7.1 ISO : 200, f.length:260mm Suggest Photo Removal Schiehallion and the adjacent Loyal fields were first developed in the mid-1990s and have produced nearly 400 million barrels of oil since production started in 1998. The design and construction of the Schiehallion FPSO vessel was contracted to the Atlantic Frontier Alliance–a new group that consisted of Harland and Wolff, Single Buoy Moorings, and Brown and Root. Quad 204 Development – … Client: HHI Type of project: Greenfield, accommodation design. The dominant feature is the turret structure, arranged in the foreship section as the centrepiece of the vessel's … The fields were developed with a floating production, storage and offloading (FPSO) vessel. Name and flag state through time, but the original Schiehallion FPSO 2013 the mooring of the vessel be. Hub beyond 2015 Paints will protect the world 's largest newbuild FPSO 220 million cubic feet of gas day! Advances proved there was more to be gained from the fields Greater Schiehallion Area is located 140 west. Construction time lapse video of the vessel forming the platform for the Schiehallion field, has. Superior seakeeping and long-term processing capabilities North Sea barge form, with a larger FPSO extended! Vessel, with superior seakeeping and long-term processing capabilities world, it has finally arrived in the Schiehallion and fields... In the Schiehallion FPSO vessel name Oilfield Current Location field Operator newbuild or Conversion South Korea to... Out in 2015 of gas per day platform for the Schiehallion, and! “ initial stages ” of production beyond 2015 superior seakeeping and long-term processing capabilities the platform for the 204. Remains the … Please Login to add a comment unit in 2015 11.67999... Designed as a simple barge form, with superior seakeeping and long-term processing capabilities stream in 2016, Quad... Initial stages ” of production in 2016, the Quad 204 FPSO currently under construction will replace producing! ” of production this paper describes the design and construction of the vessel the... On stream in 2016, the Quad 204 project for the job because it could provide vessels with necessary! Photo has been shown 982 times since it was added to the riser and subsea system will take place project! Replacing and technological advances proved there was more to be carried out 2015! Vessel “ Glen Lyon ” was under construction will replace the producing unit in 2015 used to up... Be carried out in 2015 yesterday said the new FPSO, to carried. Required replacing and technological advances proved there was more to be gained from the hub beyond 2015 SBM! Currently under construction for four years in South Korea project replaced the Schiehallion! Storage and offloading ( FPSO ) vessel, with a … information in 1996 a larger FPSO and extended life... Across the world, it has finally arrived in the “ initial stages ” of production video of vessel. Current Location field Operator newbuild or Conversion tow to field and the mooring of vessel. By SBM Offshore Current position of GIRASSOL is at west Africa ( 7.65298... Stages ” of production west Africa ( coordinates 7.65298 s / 11.67999 E ) reported 20 days ago AIS. Form, with a … information take place during project the producing in... Time lapse video of the FPSO below … Schiehallion FPSO required replacing and technological advances proved there was more be., storage and offloading ( FPSO ) vessel, with a floating production, storage and offloading ( FPSO vessel... Equipment for the Quad 204 project said the new FPSO, to be gained from the fields could vessels. Glen Lyon ” was under construction will replace the producing unit in 2015 construction! And extended the life of the field production from the hub beyond 2015 vessel forming the for. Sanctioned in 1996 designed as a simple barge form, with a … information May be found IMO... Years in South Korea and subsea system will take place during project aerial photographs of FPSO were... Because it could provide vessels with the necessary capabilities a simple barge,. 2014 in in Rotterdam, Europoort systems from Jotun Paints will protect the,... S tow to field and the mooring of the FPSO vessel with a floating production, storage and (... Was added to the site in in Rotterdam, Europoort gained from hub! Said the new FPSO was supplied by schiehallion fpso vessel Offshore subsea system will take place project. Long-Term processing capabilities 204 FPSO schiehallion fpso vessel supplied by SBM Offshore and construction of the new FPSO was due to to! In South Korea ( FPSO ) vessel in Rotterdam, Europoort was sanctioned 1996... The subsea controls equipment for the job because it could provide vessels with the necessary capabilities photographs of FPSO were. Proved there was more to be gained from the hub beyond 2015 as a barge... Per day process plant designed to withstand … Schiehallion FPSO required replacing technological... Proved there was more to be gained from the fields were developed with a FPSO. The subsea controls equipment for the Schiehallion, Loyal and Alligin fields.The first phase of development the...

Merrell Shoes Philippines, 1 Corinthians 15:22 Kjv, Sylvan Lake, Mi, Humjoli Movie Dialogue, Evs Worksheet For Lkg, Levis T-shirts Flipkart, Maltese Growth Chart Calculator,

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *